Post by River (Murray) on Dec 13, 2022 17:57:13 GMT
Hi Folks Something to take note of for planning routes in the New Year. Around Full Sutton and Stamford Bridge there will be several road closures as Northern Grid will be installing new power lines to the new prison. I have attached a copy of what was sent to house in Stamford Bridge
|
|
|
Post by Andrew R on Feb 12, 2023 13:46:42 GMT
Update from a drop in meeting last week: The closure on Moor Lane by the new prison is ahead of schedule and should be reopen now. The short bit of Moor Road between the Full Sutton and High Catton turns will close for about a week from tomorrow (13th Feb). The section heading south from High Catton will be next followed by Mitchell Lane and Howlgate. I was assured that there will be pedestrian access through all closed roads with cyclists asked to dismount.
|
|
|
Post by Andrew R on Mar 6, 2023 19:21:23 GMT
All roads are currently open and future closures are a way off, but shouldn’t affect any of our usual routes
|
|