Post by Andrew R on Dec 18, 2023 13:16:42 GMT
Issued today on Sutton on Derwent Facebook page: We've been informed that the closure of Hagg Bridge will be temporarily lifted at the 𝗲𝗻𝗱 𝗼𝗳 𝘁𝗵𝗲 𝗱𝗮𝘆 on Wednesday, 20th December. The contractors are then looking to close the bridge again between 8th January and 12th January 2024 to fully complete these repairs. Should these dates change, we'll let you know as soon as possible.
For safety, 𝗮 𝟭𝟬𝗺𝗽𝗵 𝗹𝗶𝗺𝗶𝘁 𝘄𝗶𝗹𝗹 𝗯𝗲 𝗶𝗻 𝗽𝗹𝗮𝗰𝗲 for the duration of the reopening, as a temporary ramp will be in place to allow this. 𝗣𝗹𝗲𝗮𝘀𝗲 𝗮𝗱𝗵𝗲𝗿𝗲 𝘁𝗼 𝘁𝗵𝗶𝘀 𝘀𝗽𝗲𝗲𝗱 𝗹𝗶𝗺𝗶𝘁 𝗳𝗼𝗿 𝘆𝗼𝘂𝗿 𝗼𝘄𝗻 𝘀𝗮𝗳𝗲𝘁𝘆 𝗮𝗻𝗱 𝘁𝗵𝗲 𝘀𝗮𝗳𝗲𝘁𝘆 𝗼𝗳 𝗼𝘁𝗵𝗲𝗿𝘀.
|
|
|
Post by Andrew R on Jan 7, 2024 15:56:42 GMT
UPDATE MESSAGE FROM SUTTON UPON DERWENT PC @ 3:03pm, Friday 5th January 2024: "We have just spoken with ERYC engineers regarding Hagg Bridge. The temporary reopening of the bridge will end on Monday 8th January, as planned. All efforts are being made (including removal of surface water, which is ongoing) to ensure that work can commence from this point. Whether work can commence or not from Monday will largely be down to weather/flood conditions over the weekend and into next week, but given the temporary nature of the surface on part of the bridge and its degradation over the festive period, the closure on Monday is deemed necessary regardless, on the grounds of safety. If work cannot continue early next week, it is likely that the job will have to be pushed back, as colder weather is anticipated after this. If this is the case, ERYC will look to redo the temporary surface on the bridge to allow the bridge to reopen once again until such a time that conditions allow the work to continue." (Hagg Bridge, photo taken about 10am Sat 06/01/2024, see attached photo: www.facebook.com/photo/?fbid=642123064801367&set=pcb.640671661613174).
|
|
|
Post by Andrew R on Jan 14, 2024 14:20:55 GMT
From Sutton upon Derwent Facebook page on Saturday 13th January: Hagg Bridge should reopen on Monday 15th January, as planned. Application of road markings and traffic light recommissioning will need to take place on Monday itself, so the opening time is as yet unknown, but should be before 5pm.
|
|